Seitenansicht 4
6
12
(304.8 mm)
9
(228.6 mm)
6
(152.4 mm)
Tube Spacing
• Residential slabs will use 6" (152.4 mm), 9" (228.6 mm), or 12"
(304.8 mm) tube spacing with some perimeter banding. Banding is
any area where the tubing is installed with a tighter on center spacing.
Usually seen along exterior walls with higher than normal heat loss.
• Spacingwiderthan12"(304.8 mm) may produce unacceptable floor
temperature variations (striping). Tube spacing wider than 12" on
center is not recommended.
Fasteners
Tubing can be attached to either the rewire, rebar or below slab
insulation. The following can be used, depending on
installation requirements:
• Nylon CableTies—used to secure tubing to either rewire or rebar
12"-18" (304.8 mm - 425.2 mm) on center.
• FoamBoardStaplescanbeusedtosecuretubingdirectlytothe
horizontal board insulation below the slab.
Slab Profile and General Details
InSlab-on-Gradeapplications,aminimumof2"-3"(50.8mm-76.2
mm) of concrete covering must be maintained above the tubing. More
coverage may be necessary depending on the structural requirements
of the slab.
Installation Steps
Manifold locations, final concrete
thickness and zoning details can
affect how a concrete application
is installed. The following
guidelines cover the most
common installation conditions.
If a given situation is not covered
here, or if unexpected
circumstances arise, please
contact Watts or a
heating professional.
1. Pre-Pour Conditions
• Verify all su/jointfilesconvert/543493/bgrade conditions
are properly prepared.
• Rewire or rebar are in place
and installed according to
design conditions.
• With orange spray paint, locate all interior walls and other obstacles
to be avoided, such as toilet areas, sewer drains, and any structural
supports that may penetrate the slab.
2. Install Manifolds
Locate where the manifolds are to be installed.
• Drive two pieces of rebar vertically into the ground. They may be
removed after the slab is poured and made ready for framing.
• Securethemanifoldswiththeuseofcabletiesorelectricaltape.
• Keepmanifoldshighenoughtoallowforthethicknessofthe
concrete, the interior wall base plate and other structural items
which may be installed after the pour.
Tube Spacing
Insulation Layer and/or
Vapor Barrier
Compacted
Su/jointfilesconvert/543493/bgrade
Typical Rewire Mesh
Slab Su/jointfilesconvert/543493/bgrade Detail
Manifold Pair
Temporary
Rebar
Supports
Slab - Manifold Installation Detail