Nudo Products, Inc.
1500 Taylor Avenue
Springfield, IL 62703
Phone 1.800.826.4132 * 1.217.528.5636
Fax 1.217.528.8722
Form 6013 Rev. 02 10/14
www.nudo.com
GroundBreaker™
Installation
Guidelines
6013
______________________________________________________________ Rev. 02 10/14
Please Read Disclaimers:
PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!!
These guidelines are provided in good faith to help prevent any problems caused by common
errors in installation. The manufacturer and/or distributor of this product shall not be held
responsible for installation actions taken or not taken. There are many details of installation that
are assumed to be general construction knowledge to experienced installers; which are no
t
included in these instructions. These installation guidelines are intended to be strictly
recommendations and are NOT to serve as a step-by-step, fail-safe installation checklist. Selection
of an experienced installer is the sole responsibility of the project owner and architect.
Nudo Products, Inc. does not accept any responsibility for job failure resulting from or associated
with improper site environmental conditions.
Safety Instructions:
When cutting or drilling, always wear protective glasses or
goggles and a face mask which covers the face and mouth.
Itching due to fibers may be avoided by the use of barrier
creams on exposed skin areas.
Tools Needed
Circular saw with fine tooth carbide tipped saw
blade
Hammer drill with masonry bits
Trim Cutter
Wire Brush
Materials Needed
GroundBreaker™ Protection Liner 1', 2' or 4' x 50' Rolls
3-inch Stainless Roofing Nails or Nylon Rivets 3/4" x 2"
Hammer
Heavy duty construction adhesive (optional)
Trowel recommended by adhesive manufacturer
(optional)
Personal protection equipment (goggles & mask)
Tape measure
Shovel
Division, Corner Angles and J-Channel Trim
(optional)
Preparation:
Storage
All GroundBreaker™ Foundation and Insulation Protection Liner rolls
should be stored on a solid, flat, dry surface.
Prior to
Installation
Installation should NOT begin until you contact your utility company to
determine location of gas and power lines. Before installing remove
packaging materials. Allow the panels to acclimate to the temperature
and humidity for 48 hours before installing. Dig a trench 4" to 6" inches
down along-side the foundation. Placing the liner partially below grade will
help control energy loss.
Exterior Wall
Preparation
Now that the foundation is exposed, take a wire brush and remove any
dirt or loose particles from the foundation. This is extremely important if
you plan to use adhesive to fasten the liner to the insulation or foundation.
Please read adhesive manufacturers recommendation for further
Seitenansicht 0
1 2 3

Inhaltsverzeichnis

Seite 1 - GroundBreaker™

Nudo Products, Inc. 1500 Taylor Avenue Springfield, IL 62703 Phone 1.800.826.4132 * 1.217.528.5636 Fax 1.217.528.8722 Form 6013 Rev. 02 10/14 Info@

Seite 2 - Installation Steps

Nudo Products, Inc. 1500 Taylor Avenue Springfield, IL 62703 Phone 1.800.826.4132 * 1.217.528.5636 Fax 1.217.528.8722 Form 6013 Rev. 02 10/14 Info@